
Forklift loading a wrapped machine into a 40-foot container at the E-SHION plant.
Home/Case Studies/Film scrap to reusable pellets
Project configuration
Granulating lines that turn film scrap and edge trim back into pellets for the same production hall — cutting material cost and waste, with pellets ready to feed the blown film line again.
Project configuration
Typical configuration from our project base. Exact values are confirmed in the proposal for your line.
| Parameter | Details |
|---|---|
| Screw diameter | Ø100 – 150 mm |
| Output | 150 – 500 kg/h |
| Main motor | 30 – 90 kW |
| Screw L/D | 28:1 – 32:1 |
| Materials | HDPE / LDPE / PP |
How a project is delivered
A machinery project is a process, not a shipment. Four steps keep every installation on schedule.
Material, film width, output rate and factory conditions define the line. Every component is confirmed in the proposal before production starts.
Machines are assembled and run with your recipe before shipment. Videos and test reports are shared so you see the line running before it leaves.
Engineers supervise installation on site, run the first production trials and hand over a documented, tuned line.
24/7 technical support, structured operator training and OEM spare parts shipped globally — from first run to full production.
Shipment Log
Buyers ask
Yes, on request. The typical configurations above show what we build; for your market we can arrange direct references, a factory visit or a video walk-through before you order.
Yes. Our engineers supervise installation on site, run the first production trials and hand over a documented, tuned line, worldwide.
24/7 support line to our engineering team in more than 50 countries, average first response within 4 hours on business days.
Original spare parts - screw elements, die rings, sealing bars, drives and control boards - are shipped globally; urgent parts are dispatched within 48 hours.
Yes. Line modernization adds co-extrusion heads, servo drives or process controls to raise output and cut waste without replacing the whole line.
Get your custom solution
Tell our engineering team your output target and facility conditions. We design and build machinery to match — average response time 4 hours.
Start Your Project →