Home/Case Studies/Compact single-layer film line

Project configuration

Compact single-layer film line

A small-footprint line for bag producers entering the market or running a dedicated PE bag product — from 100 to 800 mm folded width with simple operation and quick recipe changes.

Project configuration

Project configuration

Typical configuration from our project base. Exact values are confirmed in the proposal for your line.

ParameterDetails
Folded width100 – 800 mm
Film thickness0.01 – 0.12 mm
Max. output35 – 50 kg/h
Main power11 kW
Total power20 kW
Screw diameterΦ50 mm

What the line includes

PID temperature controllersBuilt-in air compressorDual-station single winderLiftable traction frame

How a project is delivered

From specification
to running line

A machinery project is a process, not a shipment. Four steps keep every installation on schedule.

01

Engineered to your spec

Material, film width, output rate and factory conditions define the line. Every component is confirmed in the proposal before production starts.

02

Built & factory tested

Machines are assembled and run with your recipe before shipment. Videos and test reports are shared so you see the line running before it leaves.

03

Installed & commissioned

Engineers supervise installation on site, run the first production trials and hand over a documented, tuned line.

04

Supported for life

24/7 technical support, structured operator training and OEM spare parts shipped globally — from first run to full production.

Buyers ask

Before you start
a project

Can you share customer references?

Yes, on request. The typical configurations above show what we build; for your market we can arrange direct references, a factory visit or a video walk-through before you order.

Do you provide installation and commissioning?

Yes. Our engineers supervise installation on site, run the first production trials and hand over a documented, tuned line, worldwide.

How fast is your technical support?

24/7 support line to our engineering team in more than 50 countries, average first response within 4 hours on business days.

How quickly can I get spare parts?

Original spare parts - screw elements, die rings, sealing bars, drives and control boards - are shipped globally; urgent parts are dispatched within 48 hours.

Can you upgrade my existing line?

Yes. Line modernization adds co-extrusion heads, servo drives or process controls to raise output and cut waste without replacing the whole line.

Get your custom solution

Your project,
engineered next

Tell our engineering team your output target and facility conditions. We design and build machinery to match — average response time 4 hours.

Start Your Project
Chat with us — usually replies in minutes